← 글 목록← All articles

Can a patent application be converted into a utility model application in Korea?

Brief summary

  • Yes. Article 10 of the Utility Model Act (실용신안법) provides for a converted application (변경출원). The conversion is limited to the matter stated in the specification or drawings originally attached to the written patent application.
  • The conversion is no longer possible once 3 months have passed from the date on which the certified copy of the first decision of rejection (decision to reject a patent application) of that patent application is served.
  • A converted application is deemed to have been filed as a utility model application at the time the patent application was filed. The original patent application is deemed withdrawn.
  • The converted application fee is KRW 20,000 for an electronic application. The fee for request for examination is KRW 71,000 plus KRW 19,000 per claim.

The provisions are those of the Utility Model Act in force from 1 October 2025. The amounts are those of the Regulation on the Collection of Patent Fees, etc. (특허료 등의 징수규칙) in force from 27 February 2026. Last verified on 9 October 2026.

Last verified

The converted application at a glance

As of October 2026. The amounts are for an electronic application filed in Korean and prepared with the software provided by the Ministry of Intellectual Property (MOIP, 지식재산처).

Item Rule Basis
Who The applicant of that patent application Utility Model Act, Art. 10(1)
Scope The matter stated in the specification or drawings originally attached to the written patent application Utility Model Act, Art. 10(1)
Time limit Before 3 months have passed from the date on which the certified copy of the first decision of rejection is served Utility Model Act, Art. 10(1), subparagraph 1
Patent application in a foreign language Only after the Korean translation has been filed Utility Model Act, Art. 10(1), subparagraph 2
PCT international patent application Only after the official fee has been paid and the Korean translation has been filed Utility Model Act, Art. 37
Filing date Deemed filed at the time the patent application was filed Utility Model Act, Art. 10(2)
Original patent application Deemed withdrawn Utility Model Act, Art. 10(4)
Request for examination 3 years from the filing date; after that, 30 days from the date of the converted application Utility Model Act, Art. 12(2) and (3)
Term From the registration date until 10 years after the filing date Utility Model Act, Art. 22(1)
Converted application fee KRW 20,000 Fee Regulation, Art. 3(1), subparagraph 3
Fee for request for examination KRW 71,000 + (number of claims × KRW 19,000) Fee Regulation, Art. 3(1), subparagraph 6

A patent applicant can convert within the scope of the original specification and drawings

A patent applicant can convert the patent application into a utility model application (Utility Model Act, Art. 10(1)). [1] The scope is the matter stated in the specification or drawings originally attached to the written patent application. [1] A converted application that goes beyond this scope has a ground for rejection of the utility model registration (Art. 13, subparagraph 5). [1]

A person who files a converted application must state that fact and identify the patent application on which it is based in the written application for utility model registration (Art. 10(3)). [1] The written application is Form 1 of the Enforcement Rule of the Utility Model Act (실용신안법 시행규칙). The specification, the abstract and the drawings are attached to it (Enforcement Rule, Art. 8(1)). [4]

A utility model registration is available for a device (고안) that relates to the shape or structure of an article or a combination of articles (Utility Model Act, Art. 4(1)). [1] An application that cannot be registered under Article 4 is rejected (Art. 13, subparagraph 1). [1] The same applies to a converted application, because it is a utility model application. The Patent Examination Guidelines (특허·실용신안 심사기준) state that devices of a method, a composition or a chemical substance are not covered (Part 3, Chapter 1, 4.3.2). [5] The subject matter protected by a utility model is covered in “What is a Korean utility model, and when should it be used?”.

The Examination Guidelines state several more requirements for a converted application. [5] Part 6, Chapter 2 of the Examination Guidelines is written on the basis of the converted application under Article 53 of the Patent Act (특허법). The same chapter also covers the conversion of a patent application into a utility model application. [5]

  • The applicant of the original application (parent application) and the applicant of the converted application must be the same at the time of conversion (Part 6, Chapter 2, 3.1).
  • Conversion of only a part of a patent application into a utility model application is not accepted. The applicant must first file a divisional application and then convert that divisional application (6.2(2)).
  • One converted application cannot be based on more than one original application (6.2(5)).
  • If the original application is not identified or is identified incorrectly, the application is not accepted as a lawful converted application (4.(1)).

A separational application (splitting-off) cannot be the basis of a converted application (Patent Act, Art. 52-2(4)). [2]

The time limit is 3 months from service of the certified copy of the first decision of rejection

The conversion is no longer possible once 3 months have passed from the date on which the certified copy of the first decision of rejection of that patent application is served (Utility Model Act, Art. 10(1), subparagraph 1). [1] If the period for filing a petition for trial for an appeal against the examiner’s decision to reject a patent application (trial on rulings rejecting patent applications) has been extended under Article 15(1) of the Patent Act, the extended period is the limit. [1] The Minister of Intellectual Property can extend that period only once, by up to 30 days (Patent Act, Art. 15(1), main clause). [2] For a person in a remote area or an area with poor access to transport, the number and length of extensions can be increased further (proviso to the same paragraph). [2]

The provision refers to the “first” decision of rejection. The Examination Guidelines address the case in which a decision of rejection is cancelled through a request for re-examination or by a trial decision. A converted application cannot be filed after 3 months have passed from the date on which the certified copy of the first decision of rejection was served. This is so even if a certified copy of a decision of rejection is served again and the filing is within 3 months from that date (Part 6, Chapter 2, 6.2(6)). [5]

The same 3 months are also the period for a request for re-examination and for an appeal against the decision to reject (Patent Act, Art. 67-2(1) and Art. 132-17). [2] The Examination Guidelines also address a converted application filed at the same time as a request for re-examination or a petition for trial. The original application is treated as deemed withdrawn, and each procedure is handled on that basis (Part 6, Chapter 2, 6.2(3)). [5]

The 3-month period applies to patent applications for which the certified copy of the decision of rejection is served on or after 20 April 2022 (Patent Act, Addenda to Act No. 18505, Art. 13). [2] Before that, Article 10(1), subparagraph 1 of the Utility Model Act set this period at 30 days. [6]

Article 10 of the Utility Model Act does not separately set a first day on which a converted application can be filed. [1] Patent applications in a foreign language and PCT international patent applications are subject to the requirements in the section below. The Examination Guidelines state the period for a converted application as running from the filing date of the patent application until before registration of the grant of a patent (registration of establishment of a patent right) (Part 6, Chapter 2, 3.2(1)). [5] A converted application cannot be filed if the original application has been invalidated, withdrawn or abandoned, or has been registered (3.2(2)). [5] The same applies if the decision of rejection has become final (Part 5, Chapter 3, 4.4(3)). [5]

A converted application filed after the period is returned after the applicant has been given an opportunity to explain (Examination Guidelines, Part 5, Chapter 3, 4.4(2)). [5]

A converted application is deemed filed at the time the patent application was filed

A converted application is deemed to have been filed as a utility model application at the time the patent application was filed (Utility Model Act, Art. 10(2), main clause). [1] Article 4(1) and (2) of the Utility Model Act assess novelty and inventive step by reference to the time “before the filing of the utility model application”. [1]

The proviso to the same paragraph excludes this retroactive effect in four cases. [1]

  • Where the converted application is “another utility model application” under Article 4(3) of the Utility Model Act and that paragraph is applied. The same holds where it is a “utility model application” under Article 29(4) of the Patent Act and that paragraph is applied.
  • Where Article 30(2) of the Patent Act is applied. This is the provision under which the claim for the disclosure exception (exception to lack of novelty; grace period) is stated in the written application and the supporting documents are filed.
  • Where Article 54(3) of the Patent Act is applied. This is the provision under which the priority claim under the Treaty, the name of the country and the filing date are stated in the written application.
  • Where Article 55(2) of the Patent Act is applied. This is the provision under which the domestic priority claim and the identification of the earlier application are stated in the written application.

The Examination Guidelines require that an applicant who wants to make a claim for the disclosure exception or a priority claim for a converted application state that claim in the written converted application (Part 6, Chapter 2, 4.(2)). [5] If no priority claim was made in the original application, a priority claim made in the converted application is not accepted. [5] The claim for the disclosure exception is different. Even if it was not made in the original application, it is accepted if it is made in accordance with the procedure at the time of the converted application. This applies where the original application was filed within 12 months from the date of disclosure. [5] The supporting documents for the claim for the disclosure exception are filed within 30 days from the date of the converted application. [5]

When a converted application is filed, the patent application is deemed withdrawn (Utility Model Act, Art. 10(4)). [1] The Examination Guidelines state that the original application does not become pending again even if the converted application is later invalidated, withdrawn or abandoned, or its decision of rejection becomes final. The exception is the case in which the converted application is returned (Part 6, Chapter 2, 5.(2)). [5]

The term of a utility model right runs from the registration date of the establishment of the utility model right until 10 years after the filing date of the utility model application (Utility Model Act, Art. 22(1)). [1] The filing date of a converted application is deemed to be the filing date of the original patent application, so the 10 years are also counted from that date (Art. 10(2), main clause). [1] If the conversion takes place several years after the patent application was filed, the remaining term is shorter by that length of time.

The start date is different for the extension of the term of a utility model right due to registration delays. When the 4 years from the filing date are counted, the filing date of a converted application is taken to be the date on which the converted application was filed (Art. 22-2(4), subparagraph 1). [1]

A converted application cannot be the earlier application on which a domestic priority claim is based (Patent Act, Art. 55(1), subparagraph 2). [2]

Time limits after the converted application is filed

A utility model application is examined only when a request for examination is filed (Utility Model Act, Art. 12(1)). [1] Examination can be requested within 3 years from the filing date (Art. 12(2)). [1] For a converted application, examination can also be requested after those 3 years, within 30 days from the date on which the converted application was filed (Art. 12(3), subparagraph 1). [1] If no request for examination is filed within the period, the converted application is deemed withdrawn (Art. 12(5)). [1]

A separate request for examination is needed for the converted application even if examination was requested for the patent application. This is because Article 12(1) and (5) apply to a converted application as they stand. [1] Article 9(2), subparagraph 3 of the Enforcement Rule of the Utility Model Act also refers to the case in which a patent application with a request for examination is converted and examination is requested for the converted application. [4] The Examination Guidelines state the order of examination where the original application was converted after examination was requested. Examination starts in the order of the request for examination of the original application (Part 5, Chapter 1, 6.1(5)). [5]

There are three other time limits.

  • The priority document for a priority claim under the Treaty can be filed within 3 months from the date of the converted application, even after 1 year and 4 months have passed from the earliest priority date (Art. 10(6); Patent Act, Art. 54(5)). [1][2]
  • If the converted application is a utility model application in a foreign language, the time limit for the Korean translation is longer. Even after the ordinary time limit has passed, the Korean translation can be filed until the day that is 30 days from the date of the converted application (Art. 10(7)). [1]
  • The same applies to a converted application whose specification does not state claims. Even after the ordinary time limit has passed, an amendment adding claims can be filed until the day that is 30 days from the date of the converted application (Art. 10(8)). [1]

In some cases, the fee for request for examination already paid for the patent application can be refunded. Article 84(1), subparagraph 5 of the Patent Act provides for a refund of the fee for request for examination if the patent application is withdrawn after the request for examination and before certain notices are issued. [2] Those notices are the order to report consultation results, the notice of grounds for rejection and the service of a certified copy of the decision to grant. [2] The Examination Guidelines state that this withdrawal includes a withdrawal caused by a converted application (Part 1, Chapter 7, 4.⑤). [5] The provisions that the parentheses of that subparagraph name directly are Article 53(4) and the main clause of Article 56(1) of the Patent Act. [2]

An examiner must issue a notice of grounds for rejection before issuing a decision of rejection (Patent Act, Art. 63(1)). [2] A converted application filed after a decision of rejection is therefore outside the refund under subparagraph 5.

Subparagraph 5-2 of the same paragraph separately provides for a refund of one third of the fee for request for examination. It covers a withdrawal after a notice of grounds for rejection that falls under Article 47(1), subparagraph 1 of the Patent Act and before the period for submission of a written argument ends. [2] It also covers a withdrawal after an order to report consultation results and before the reporting period ends. [2] The Examination Guidelines state that a withdrawal caused by a converted application is included here as well (Part 1, Chapter 7, 4.⑥). [5]

Patent applications in a foreign language and PCT international patent applications

A patent application in a foreign language, in which the specification and drawings are written in a language other than Korean, can be converted only after the Korean translation has been filed. The conversion is not possible if the Korean translation under Article 42-3(2) of the Patent Act has not been filed at the time of conversion (Utility Model Act, Art. 10(1), subparagraph 2). [1]

A converted application based on a PCT international patent application has further requirements. It can be filed only after the official fee under Article 82(1) of the Patent Act has been paid and the Korean translation under Article 201(1) of the Patent Act has been filed (Utility Model Act, Art. 37). [1] The translation requirement does not apply to an international patent application filed in Korean. [1] An international application that is deemed a patent application under Article 214(4) of the Patent Act can be converted only after the decision under that paragraph has been made. [1]

The Korean translation under Article 201(1) of the Patent Act is the translation filed within 31 months from the priority date. [2] Where the applicant has filed a document stating an extension of the filing period under the proviso to that paragraph, the translation can be filed until the day that is 1 month from the expiration date of that period. [2]

Costs

The converted application fee is the same amount as the filing fee for a new utility model application (Fee Regulation, Art. 3(1), subparagraph 3). [3] It is KRW 20,000 per application when the written application is filed electronically. It is KRW 25,000 when the specification, drawings and abstract are prepared with software not provided by MOIP (subparagraph 1 (a) of the same paragraph). [3] For a utility model application in a foreign language, it is KRW 32,000 for an electronic application (item (c) of the same subparagraph). [3]

The fee for request for examination is KRW 71,000 per application plus KRW 19,000 per claim (subparagraph 6 of the same paragraph). [3]

These amounts have been the same from the version in force from 15 February 2021 to the current version. [3]

Example: schedule of a converted application after a decision of rejection

This is an assumed case. It is a patent application filed in Korean without a priority claim, and the period for filing a petition for trial has not been extended.

Date Event Basis
2 March 2023 Patent application filed Assumed
8 October 2026 Certified copy of the first decision of rejection served Assumed
6 January 2027 Converted application filed. Its filing date is deemed to be 2 March 2023 Utility Model Act, Art. 10(2)
8 January 2027 Last day on which the converted application could have been filed Utility Model Act, Art. 10(1), subparagraph 1
5 February 2027 Last day to request examination Utility Model Act, Art. 12(3), subparagraph 1
2 March 2033 End of the term, if the utility model is registered Utility Model Act, Art. 22(1)

The first day of a period is not counted (Patent Act, Art. 14, subparagraph 1). [2] A period set in months ends on the day before the day in the last month that corresponds to the start date (subparagraph 3 of the same article). [2] If the last day of a period is a public holiday, the period ends on the next day. Public holidays here include Saturdays and Workers’ Day (subparagraph 4 of the same article). [2] Article 3 of the Utility Model Act applies this article mutatis mutandis. [1] In this example, 8 January 2027 and 5 February 2027 are Fridays.

In this example, the day that is 3 years from the filing date was 2 March 2026 and has already passed. Examination must therefore be requested within 30 days from the date on which the converted application was filed.

With 5 claims, the converted application fee of KRW 20,000 and the fee for request for examination of KRW 166,000 add up to KRW 186,000. With 10 claims, KRW 20,000 and KRW 261,000 add up to KRW 281,000. These figures are for an applicant with no fee reduction who files an electronic application in Korean. Agent fees are not included.

Example: converting to a utility model application after a decision of rejection

How Korea differs

Japan also allows a patent application to be converted into a utility model application (Utility Model Act of Japan, 実用新案法, Art. 10(1)). [7] The time limit of 3 months from the date on which the certified copy of the first decision of refusal is served is the same as in Korea. [7] There are two differences.

Item Korea Japan
Time limit counted from the filing date None in Art. 10 of the Utility Model Act No conversion after 9 years and 6 months from the filing date of the patent application (実用新案法, Art. 10(1), proviso)
Application that can be the basis of conversion Patent application (Utility Model Act, Art. 10(1)) Patent application and design application (実用新案法, Art. 10(1) and (2))

The systems of the United States, Europe and China are not compared here, because their original texts were not read for this article.

What applicants should do

  • In general, on receiving a first decision of rejection, we suggest weighing re-examination, an appeal against the decision to reject, a divisional application and a converted application together and deciding within the 3 months.
  • A converted application causes the patent application to be deemed withdrawn. If claims remain that are worth pursuing as a patent, it is worth considering a divisional application first.
  • We do not suggest a converted application if the claimed subject matter is a method or a composition. A utility model covers the shape or structure of an article or a combination of articles.
  • If several years have passed since the filing date of the patent application, we suggest calculating the remaining term first. The 10 years are counted from the filing date of the original patent application.
  • If a decision of rejection is issued again after a request for re-examination, the route to a converted application may already be closed. The time limit is counted from the certified copy of the first decision of rejection.
  • For a patent application that entered Korea through the PCT, we suggest first checking that the official fee has been paid and the Korean translation has been filed.

FAQ

Can a patent application still be converted into a utility model application after a decision of rejection?

Yes. The conversion must be made before 3 months have passed from the date on which the certified copy of the first decision of rejection is served (Utility Model Act, Art. 10(1), subparagraph 1). [1]

What is the filing date after conversion into a utility model application?

The converted application is deemed filed at the time the original patent application was filed (Utility Model Act, Art. 10(2), main clause). [1] The 10-year term is also counted from that date. [1]

Can the original patent application continue after the converted application is filed?

No. When a converted application is filed, the patent application is deemed withdrawn (Utility Model Act, Art. 10(4)). [1]

Can a patent application that entered Korea through the PCT also be converted into a utility model application?

Yes. The converted application can be filed only after the official fee under Article 82(1) of the Patent Act has been paid and the Korean translation has been filed (Utility Model Act, Art. 37). [1]

Can a utility model application be converted into a patent application in the other direction?

Yes. Article 53(1) of the Patent Act provides for this with the same scope and the same time limit of 3 months. [2]

How DEFINE IP Law Firm handles this

DEFINE IP Law Firm checks whether a converted application is an option at the stage when the first decision of rejection is received. The criteria we check are whether the claimed subject matter is the shape, structure or combination of articles, and the remaining term. Please confirm the choice in an individual case with your agent. For questions about converting a Korean patent application into a utility model application, please write to contact@defineip.kr.

Sources

  1. Utility Model Act (실용신안법), Act No. 21065, in force from 1 October 2025. Articles 3, 4, 10, 12, 13, 22, 22-2 and 37. https://www.law.go.kr/법령/실용신안법 (verified 9 October 2026)
  2. Patent Act (특허법), Act No. 21134, in force from 11 November 2025. Articles 14, 15, 29, 30, 42-3, 47, 52-2, 53, 54, 55, 56, 63, 67-2, 82, 84, 132-17, 201 and 214, Addenda (Act No. 18505, 19 October 2021) Arts. 1 and 13. https://www.law.go.kr/법령/특허법 (verified 9 October 2026)
  3. Regulation on the Collection of Patent Fees, etc. (특허료 등의 징수규칙), Prime Ministerial Decree No. 2098, in force from 27 February 2026. Article 3(1). https://www.law.go.kr/법령/특허료등의징수규칙 (verified 9 October 2026)
  4. Enforcement Rule of the Utility Model Act (실용신안법 시행규칙), Prime Ministerial Decree No. 2114, in force from 14 May 2026. Articles 8 and 9, Form 1. https://www.law.go.kr/법령/실용신안법시행규칙 (verified 9 October 2026)
  5. Ministry of Intellectual Property (지식재산처), Patent Examination Guidelines (특허·실용신안 심사기준), MOIP Established Rule No. 7, in force from 13 March 2026. Part 1, Chapter 7, 4.; Part 3, Chapter 1, 4.3.2; Part 5, Chapter 1, 6.1; Part 5, Chapter 3, 4.4; Part 6, Chapter 2, 3. to 6. https://www.law.go.kr/행정규칙/특허·실용신안심사기준 (verified 9 October 2026)
  6. Utility Model Act (실용신안법), Act No. 18409, in force from 18 November 2021 (previous version). Article 10(1), subparagraph 1. Version history at https://www.law.go.kr/법령/실용신안법 (verified 9 October 2026)
  7. Japan, Utility Model Act (実用新案法, 昭和34年法律第123号), current text on e-Gov 法令検索 (reflecting amendments in force up to 21 May 2026). Article 10. https://laws.e-gov.go.jp/law/334AC0000000123 (verified 9 October 2026)